Metal Structure Mezzanine Floor (Haye De Studio)
Client:
Ms Teo
Project Duration:
14 October 2019 – 30 November 2019
Project Value:
RM 78,000.00
Work Scope:
As a main contractor for the project and the work included:
– Site survey and proposed design
– Architectural work
– Structural Steel Work
– Glass work
– Supervision the work progress
Metal Structure Mezzanine Floor
Client:
Wrap Xpert (Dato Sri Ee)
Project Duration:
12 March 2018 – 21 June 2018
Project Value:
RM 322,299.36
Work Scope:
As a main contractor for the project and the work included:
– Site survey and proposed design
– Architectural work
– Structural Steel Work
– Glass work
– Supervision the work progress
Design & Build (Speed X Moto)
Client:
Mr Goh
Project Duration:
15 December 2019 – 03 January 2020
Project Value:
RM 185,000.00
Work Scope:
As a main contractor for the project and the work included:
– Site survey and proposed design
– Architectural work
– Structural Steel Work
– Glass work
– Supervision the work progress