Metal Structure Mezzanine Floor (Haye De Studio)

@ Dataran Cheras C18

Client: 

Ms Teo

Project Duration: 

14 October 2019 – 30 November 2019

Project Value: 

RM 78,000.00

Work Scope: 

As a main contractor for the project and the work included:

– Site survey and proposed design
– Architectural work
– Structural Steel Work
– Glass work
– Supervision the work progress

Metal Structure Mezzanine Floor

@ Glenmarie

Client: 

Wrap Xpert (Dato Sri Ee)

Project Duration: 

12 March 2018 – 21 June 2018

Project Value: 

RM 322,299.36

Work Scope: 

As a main contractor for the project and the work included:

– Site survey and proposed design
– Architectural work
– Structural Steel Work
– Glass work
– Supervision the work progress

Design & Build (Speed X Moto)

@ Platinium Walk , Setapak

Client: 

Mr Goh

Project Duration: 

15 December 2019 – 03 January 2020

Project Value: 

RM 185,000.00

Work Scope: 

As a main contractor for the project and the work included:

– Site survey and proposed design
– Architectural work
– Structural Steel Work
– Glass work
– Supervision the work progress